Main body dismantlement House decoration Precautions Home decoration Precautions Decoration Precautions House decoration Precautions Luggage Wheel Axle,Replace Luggage Wheels,Replacement Wheels For Luggage,Carry On Luggage Wheel VOLO silent wheel , https://www.volowheels.com
[ Main body demolition process]
Including the demolition of walls, walls, shovel wall, demolition heating, change steel windows and so on. When the main body is dismantled and reformed, it is to put the framework of the construction site first.
If it is an old house here, you need to do what you need to do with the air-conditioner, so that you can paint later.
Wall treatment: If the original putty is a waterproof putty, you don't need to shovel it. If you don't need a layer of interface agent, you will need to scrape and put it again. If not, all shovel it out and do it again. Putty scraping 2-3 times on it. In places where the walls are grooved, they should be sealed with plaster, affixed with real kraft paper (pulled continuously), and then puttyed. Empty drums or cracks must be handled.
The demolition of the main body is the first one to be put on the project. It mainly includes the demolition of walls, walls, shovels, removal of heat, replacement of steel windows, and so on. After the demolition of the completed garbage, it must be cleared up in time to ensure the cleanliness of the interior, but also to facilitate the construction. At this point, the finished door should be set. At this time, it is best to look through cabinets, hoods, stoves, and water heaters, and you can make sure.
ã€Main body demolition reform matters needing attention】
First, the wall treatment <br> If the original putty is a waterproof putty, do not shovel, and uneven will need to brush a layer of interface agent and scrape it again putty leveling. If not, all shovel it out and do it again. Putty scraping 2-3 times on it. In places where the walls are grooved, they should be sealed with plaster, affixed with real kraft paper (pulled continuously), and then puttyed. Empty drums or cracks must be handled.
The demolition of the main body is the first one to be put on the project. It mainly includes the demolition of walls, walls, shovels, removal of heat, replacement of steel windows, and so on.
Second, pay attention to the details <br> The main body of the relocation can make the space more practical, change the garbage, it is necessary to clean up in a timely manner to ensure the cleanliness of the interior, but also to facilitate the construction. At this point, the finished door is set, and cabinets, hoods, stoves, and water heaters can all be determined.
1. The load-bearing wall must not move, and even one hole should not be opened.
2. Before the hydropower reform, the transformation of the main body is basically completed.
Third, the specific analysis <br> load-bearing wall must not move First, we must remind everyone that the bearing wall must not move, and even an empty should not open.
How to judge whether the wall is a bearing wall?
Judging by sound: knocking on the wall, there is a crisp echo, is a light wall, and bearing walls should not have too much sound.
Judging by the thickness: The wall thickness of the non-bearing wall is obviously thinner than the load-bearing wall, generally about 10 cm thick. The load-bearing wall is generally thicker, second only to the exterior wall. The thickness is basically the same as the bearing wall. In general, when the load-bearing wall is a brick wall, the thickness is 24cm, and the thickness of the concrete wall structure is 20cm or 16cm.
Judging by location: The outer walls are usually load-bearing walls, and the walls shared with neighbors are also. The general non-bearing walls are in bathrooms, storage rooms, kitchens and aisles.
Xiao Bian concludes: The above has introduced the matters needing attention of main body dismantling and reform , hope to be helpful to everybody. For more relevant knowledge, please continue to pay attention to this website information platform. Follow-up will present more exciting content for everyone.
First of all, we must realize that the purpose of the transformation of the home structure is to make the comfort zone more comfortable and practical. The transformation is only a means. It must not be transformed for the sake of transformation, blindly “going on†and slipping into the wrong direction. Next, small series to popularize the process and the main body Chaigai Cagai precautions, and we want to help.