The workpiece shown in Figure 1 is a zinc alloy die-casting part with a thin hole wall of only 1 mm, φ16.1_(-0.12)~(-0.05)mm, φ15.4_(0.12)~(-0.05)mm and a seal ring therebetween. The groove and the right end are both processed parts. There is a parting line on the outer circle of the bad part φ11.2±0.1mm, and only the inner hole of φ9.3_0~(+0.1)mm is selected as the clamping part. To this end, we designed the fixture shown in Figure 2.

Bridge Concrete Formwork

This product is suitable for all kinds of bridge concrete construction.


Project Achievements: Guinea Project of China Railway Group; Zhongdi Group Saudi Project; Beijing-shenyang High-speed Railway; Hajia High-speed railway; Harmu High speed railway; Mu Jia high-speed railway; The Qilai High-speed Railway; Changjinghuang High-speed Railway; Chang Yi Chang High-speed railway.

Material: Q235 steel

Surface Treatment: painted or as customer requirement

Application: Bridge Engineering

Type: Bridge Formwork

Tolerance: GB or as customer requirements

Design: Provided by Li Jian

Size: Customized

MOQ: 1 set


Bridge Concrete Formwork,Concrete Formwork,Bridge Formwork,Bridge Construction Formwork

Anshan Lijian Engineering Group Co. LTD , https://www.lijianformwork.com

Posted on