Bathrooms account for the largest proportion of household water, and are prone to leaks. Bathroom leaks have a great impact on families, such as: water in areas, damp walls, and water seepage. Then how to deal with bathroom leaks , how to do a good waterproof bathroom? Let's take a look!

How to deal with bathroom leakage

1, waterproof layer leakage

The leaking of the bathroom must first find out the specific cause of the leak. If the waterproof layer leaks, you need to remove the original tiles, clean the base surface, use the cement mortar to level the floor, and then do a further waterproof treatment. Waterproof wall height should be about 30cm in order to better prevent the bathroom from leaking.

2, water pipes leaking

If it is the problem of leaking water from the upper and lower pipes, and the pipes are underground, it is necessary to consider peeling tiles for waterproofing. If it is a leaking water pipe, it is also necessary to find the location of the water leakage. Then, depending on the situation, it is necessary to determine a part of the brick to solve it.

3, ceiling leaking

The inside of the bathroom is relatively humid and often surrounded by a lot of water vapor. Long-term accumulation can easily lead to corrosion of ceiling materials and leakage. Therefore, the best way to repair bathroom leaks is to replace the ceiling with a waterproof PVC gusset plate that is installed on the keel to shield the pipeline. This is also the best way to prevent moisture.

4, ground water leakage

If it is a case where hot and cold water pipes leak from the floor, the concrete method is to open the tiles, find the joints of the pipes, and seal them. If there is a crack in the water pipe, it is necessary to replace the water pipe, and then re-burie the water pipe, repair the waterproof layer within the range, and restore the floor tile.

What are the bathroom waterproofing steps

1, brush the first time waterproof paint.

Before the construction, it is necessary to ensure that the surface is clean and dry, the waterproof coating is to be painted, and it is firmly bonded to the grass-roots layer without cracks, bubbles, or flakes.

1, brush the second time waterproof coating.

When the second pass of waterproofing is performed, a certain time interval is required. It is necessary to wait until the first pass of the paint is dry before the second pass of the paint can be performed. If the interval time is too short, the waterproof effect will be greatly reduced.

2, shop protection layer.

After waterproofing, the surface needs to be protected to prevent the subsequent construction from damaging the waterproof layer. The protective layer should completely cover the waterproof layer and be firmly bonded with the base layer to prevent the appearance of the waterproof layer falling off.

3, closed water test.

After the waterproofing is completed, the closed water test should be performed. It should be noted that the water at the highest point of the ground cannot be lower than 2 cm, and it should be stored for at least 24 hours, and it should be considered as qualified after observing no leakage.

Xiaobian Summary:! Leaking between health solutions as well as toilet water content steps introduced over, we want to help master the toilet water after a practice, do not have to worry about a leaking toilet.

Leaking toilet

Direct-connected Integrated Water Supply Pump Set

Direct-Connected Integrated Water Supply Pump Set,Water Supply Equipment,Integrated Water Supply Equipment,Tap Water Supply Equipment

Shanghai NuoSai Pump Manufacturing Co., Ltd. , https://www.nuosai.net

Posted on