With the advent of winter, radiators should be the most practical among heating methods and heating equipment. Radiator has a good heat dissipation effect, high work efficiency, can continuously stabilize the temperature of the room, and is loved and supported by many families. Next, Xiao Bian will introduce how to install radiators and radiator leaks. How to install radiator 1, before installing the radiator, we must first measure the size of the field in order to determine the number of radiators, and plan the Department of the water out of the program and determine the installation location, and then select the model according to their own preferences, and finally the technician according to the actual situation And communicate with the owners to determine the type of the radiator, the number of groups, the number of pieces per group and the installation location, etc., and signed a radiator purchase and sales contract with the seller; 2. The second step is to sign a construction agreement with the decoration company so that the risk and quality of installing the radiator are well guaranteed. The general construction company must indicate in the construction agreement that the construction of the heating system must guarantee at least one heating season. If the radiator sales units and construction units are the same unit, the best. 3. Finally, the construction process of the radiator installation is divided into several stages. Generally, the installation of the radiator is divided into two steps: the first phase and the second phase. The first phase of heating includes positioning of heating equipment, grooving, piping (or rerouting), pipe connection (weld pipe), installation of manifolds, and pressure testing; the second phase includes: installation of radiators (radiators) The fixed suspension, the connection of the valve to the radiator and the heating pipe), the entire system pressure detection and the adjustment of the radiator. How to do radiator leakage 1. When there is a phenomenon of water leakage in the radiator, the user should carefully search for the leaked part. 2, heating system is generally divided into two routes of water supply and return, so you need to have two control valves. Therefore, after finding the leaking part, find the control valve of the leaking part. 3, to understand the direction of the valve switch, tighten the valve until it can not be screwed. 4. After all the processes are completed, the user should call the HVAC Company immediately to deal with leaks as soon as possible. Radiator mounting position 1. The living room is the place where we often come and go, and it is also the place where we treat guests. Therefore, the installation location of the radiator should be near the drying station, and not too far away from the original supervisor of the heating, within 2 to 3 meters. This is conducive to the flow of air convection, a good guarantee for the radiator heat efficiency. 2. The installation of restaurant radiators is mainly close to the area of ​​tables and chairs, and it is generally selected on the walls of that area. This ensures the comfort of the restaurant area and creates a stylish and warm dining atmosphere. 3, bedroom radiator installation, then you need to pay attention, and can not be close to the bed, it should be installed in the position of the bed, so that people can get warm foot and sober comfortable environment, in order to get a good quality of sleep. 4. The kitchen radiator should be installed in the area of ​​the cabinet so that it is beautiful and does not affect the use. Editor's summary: How to install radiators and radiator leaks is introduced here. I hope to be helpful to everyone. If you want to know more about yourself, you can follow the information on this site. Radiator how to install radiator
The LED Ceiling Light is widely used at Office, shopping mall, Hotel, showroom and so on.
The advantages for DiLin LED Ceiling Light
1. Fashion design with high quality of aluminum housing and constuction to make sure the cooling of LED Ceiling Light good enough.
2. High quality of COB and driver solution to make sure LED Ceiling light quality stable enough.
3. Strong Engineer & QC team are good at customizing and offer flexible solution for competitive Ceiling light.
4. Fast lead time: 5-7days for samples and 15-25days for bulk order.
5. 3 or 5 year warranty with standardized after-sale serivce process.
Led Ceiling Light,Ceiling Light Fixtures,Cone Ceiling Light,Ceiling And Wall Light Kits Jiangmen Dilin Lighting High-Tech Co., Ltd. , https://www.jmdilinled.com