The waterproof and leakproof of the bathroom is a very important part of the work in the bathroom renovation. Today, Xiao Bian has organized 7 small tricks for the bathroom to prevent water leakage and leakage.


Lejia bathroom

Tip 1: Make sure to waterproof the walls. Before wall tiles, waterproof the walls. In the general waterproofing process, the wall surface is to be waterproofed to a height of 30 cm. However, for a non-load-bearing lightweight wall, the entire wall should be waterproofed, and at least 60 cm in height must be achieved.

Tip 2: The seam between the wall and the ground and the seam between the upper and lower water pipes are the most prone to problems. We must supervise the workers to handle these corners. The waterproof coating must be applied in place. .

Tip 3: Resurface the floor tiles to make the floor waterproof If you need to change the original floor tiles of the bathroom, after the original floor tiles are cut, you must first level the floor with cement mortar and then do the waterproof treatment. This can avoid uneven thickness of the waterproof coating. Causes leakage. Before you do waterproofing, be sure to clean the floor.

Tip 4: Try not to destroy the original waterproof layer. The waterproof layer is applied to the floor of the newly delivered building. Therefore, leakage will not occur if the original waterproof layer is not damaged.

Tip 5: The decoration team is required to do a good job of cement lining for the upper and lower water pipes of the toilet. Brush 10 to 20 cm of waterproof paint upward from the floor, then re-do the ester waterproofing on the ground, and add the original waterproof layer to form a composite waterproof layer. To enhance waterproofness.

Tip 6: The waterproof groove in the wall should be waterproof. When the pipeline and floor drain pass through the floor during the construction process, the waterproof layer around the hole must be carefully constructed. Buried water pipes in the wall, so that a reasonable layout, the laying of water pipes will be greater than the diameter of the groove, smooth plaster groove, and then brush the groove waterproof coating.

Tip 7: Use the 24-hour "water storage test" to check the waterproof. After the waterproof project is completed, close the door and the water outlet. Fill the toilet floor with water to a certain liquid level and mark it. The liquid level is within 24 hours. If there is no obvious drop, there is no leakage in the roof of the house, especially downstairs.

Decoration Experience Tile Decoration Company Paint Cement Le house Bathroom Waterproof Toilet Tiles Bathroom Tiles Bathroom Doors ld Tiles

Black Wire

Wire Materials: Iron Wire or carbon steel wire.
Soft annealed wire offers excellent flexibility and softness through the process of oxygen free annealing.
Uses: Black annealed wire is mainly processed into coil wire, spool wire or big package wire. Or further straightened and cut into cut wire and U type wire. Annealed wire is used as tie wire or baling wire in building, parks and daily binding.
Packing: Spools, coils.
Wire Diameters: Similar to galvanized iron wire, from 5mm to 0.15mm (wire gauge 6# to 38#).

Black Drawn Wire,Nail Wire,Black Hard Wire,Black Uncoated Wire,Black Annealed Wire

Anping Sanxing Wire Mesh Factory , https://www.anpingsanxingwiremesh.com

Posted on