We should all know that the general coating machinery "target=_blank> mechanical equipment, that is, those that can meet the specified working hours or prescribed mileage according to the maintenance requirements of various mechanical equipment "target=_blank> mechanical equipment. After that, regular maintenance must be carried out, and regular maintenance is divided into: Level 1 maintenance: the key work is to lubricate, tighten and check all relevant parts and clean the three filters (ie clean air, oil, fuel filter, etc. Maintenance of other parts). Secondary maintenance: focus on inspection and adjustment. The specific content is to check the working conditions of the engine, clutch, transmission, transmission mechanism, steering and braking mechanism, working device, hydraulic system and electrical system and make necessary adjustments to eliminate the faults found and ensure the mechanical assembly, Parts have good working performance. Three-level maintenance: The focus is on detecting, adjusting, troubleshooting, and balancing the wear and tear of various parts. Diagnostic inspection and stateful inspection should be carried out on the parts that affect the performance and the parts with fault signs, so as to complete the necessary replacement, adjustment and troubleshooting.



There is also a special maintenance, this is a very important part, we must remember: the general new machine or the overhauled machinery must be carried out during the walk-in period. When the machine is used within the specified running-in period, it is necessary to increase the load and speed according to the corresponding regulations step by step, and comprehensively check the lubrication and fastening conditions, observe the condition of each part of the whole machine, and find out the abnormality and solve it in time. The focus of the maintenance is to replace the lubricating oil, lubricate the parts, and tighten the bolts. A secondary maintenance is performed after the end of the run-in period.



The machinery should be repaired once a year into the summer or before winter. The focus is on the combustion system, hydraulic system, cooling system and start-up system. According to the actual situation, we need to do the following work: replace the fuel oil and hydraulic oil, adjust the relative density of the battery electrolyte, take measures to prevent cold or cool down, and clean the cooling system.



In the mechanical equipment "target=_blank> mechanical equipment should be deactivated for a period of time due to seasonal factors (such as winter holidays).



The production department should make corresponding maintenance plans according to the use plan of various painting machines, and must be carefully implemented by the mechanical operators, so as to ensure the maintenance of each coating machine, thereby increasing the production of the coating.


About Shanghai Liangshi:
Founded in 1993, Shanghai Liangshi is a specialized manufacturing and automation system integration technology company integrating R&D, design, manufacturing, engineering installation and engineering consulting. It can solve for customers:
1. Surface treatment spray blasting, thermal spraying and painting equipment process system solutions and process equipment;
2. Automation and robot application process system solutions and process equipment;
3. Integrated solutions for pressure system integration in the fields of food dairy, pharmaceutical, biological, refrigeration, petrochemical, shipbuilding, energy, paper and textile systems.
The leading products of the company are as follows:
1. Project engineering: wire/profile/steel blasting pretreatment line, ship segment blasting coating room, container/locomotive vehicle blasting room spray booth, wind power equipment blasting room spray booth, high precision automatic blasting equipment, CNC powerful shot blasting machine, water heater liner (pressure tank) sandblasting coating production line, microchannel aluminum flat tube zinc spraying system, fluid/powder spraying production line non-standard design and manufacturing environmental sandblasting coating equipment and painting Production line, non-standard environmental protection equipment and environmental engineering, industrial robots and automated industrial control system integration.
2, single equipment: sand blasting machine, shot blasting machine, shot blasting machine, airless spraying machine, arc spraying machine, air compressor, dust removal equipment, spray booth, air purification equipment, pressure vessels, coating testing equipment.
3, pressure equipment: all kinds of carbon steel and stainless steel "target=_blank> stainless steel pressure vessel, representative products are various types of tower containers and other petrochemical equipment, medical equipment, refrigeration equipment, heat exchangers, filters, and Water treatment equipment and fire protection, high-rise water supply equipment (separate diaphragm pressure tanks, constant pressure tanks, steady flow tanks, etc.). Non-standard design and manufacture of large steel components and tower equipment.
It has set up five marketing centers in Haihai, Dalian, Ningbo, Wuhan and Hefei, and has first-class customer information sources and product marketing channels. The products are sold to more than 20 countries around the world. The company has three holding subsidiaries with a total area of ​​57,000 square meters.

For more information, please visit http:// or http://
Telephone, 68913886 Fax National Service Emergency Service Email: [email protected]
Http://news.chinawj.com.cn Daily maintenance and maintenance methods for painting equipment Editor: (Hardware Business Network Information Center) http://news.chinawj.com.cn Daily maintenance and maintenance methods for painting equipment

Wide Plank

Engineered Hardwood Flooring Wide Plank,Parquet Flooring,Red Oak Flooring,Oak Brushed Solid Wood Flooring

Shaoxing Haohua Timber Industry Co., Ltd. , https://www.woodtopiafloor.com

Posted on