Die designing→Die making→Smelting&alloying→QC→Die casting→remove burrs →QC→Surface treatment→QC→Packing→QC→Shipping→After Sale Service  Chemical Composition of Aluminum Alloy :   FAQ Electrical Goods ,Black Sockets And Switches,Lamp Holder Socket,Electric Socket Extension NINGBO LONGFLIGHT INTELLIGENT TECHNOLOGY CO.,LTD , https://www.long-flight.com
  Products Discription data
Material &  Temper
 Aluminum Alloy ADC12 ,A380
Surface  Treament
Mill-Finished,  Powder Coating,Polishing, Brushing, etc.
Colour
Shinning Polishing , powder coated as customer demand
Film  Standard
Powder coating: 60-120 μm
Part Weight
from 3 g --- 20kgs
Â
Â
Application
Industry fittings and Construction and Decoration.
Â
Â
Casting  Machine
  200-1200 tonsÂ
Capability
  Output 100 tons per month.
New Moulds
  Opening new mould about 30 days .
Fabrication
 Deep  Processing
  CNC / Cutting / Punching / Checking / Tapping / Drilling / Milling
Â
Â
Certification
  1. ISO9001-2008/ISO 9001:2008;
  2. GB/T28001-2001(including all the standard of OHSAS18001:1999);   3. GB/T24001-2004/ISO 14001:2004;   4. GMC.
 MOQ
As custimer's .  Usually 10-12 tons for a 20'FT; 20-23 tons for a 40HQ.
Â
Â
 Free  Samples
 YES
 Payment
  1. T/T: 30% deposite, the balance will be paid before delivery;
  2. L/C: the balance irrevocable L/C at sight.
 Delivery  time
  1. 15 days production ;
  2. If opening mould, plus 10-20 days.
 OEM
  Available.
 Alloy
Si
Fe
Cu
Mn
Mg
Zn
Ni
Sn
Al
ADC12
9.6-12.0
0.3-0.6
3.0-3.5
0.3-0.5
0.2-0.3
0.6-0.9
0.2-0.5
<0.3
Al
A380
7.5-9.5
1.3
3.0-4.0
0.5
0.1
3
0.5
0.35
Al
Products show
 Â
  Manufactury workshop
  Â
   Â
 Â
    Q1. What is your terms of packing?
A: Generally, we pack our goods in single color box. If you have special request about packing, pls negotiate with us in advance, we can pack the goods as your request.
Q2. What is your terms of payment?
A: T/T 30% as deposit, and 70% before delivery. We'll show you the photos of the products and packagesÂ
before you pay the balance. Other payments terms, pls negotiate with us in advance, we can discuss.
Q3. What is your terms of delivery?
A: EXW, FOB, CFR, CIF.
Q4. How about your delivery time?
A: Generally, it will take 25 to 30 days after receiving your advance payment. The specific delivery time dependsÂ
on the items and the quantity of your order.
Q5. Can you produce according to the samples?
A: Yes, we can produce by your samples or technical drawings. We can build the molds and fixtures.
Q6. What is your sample policy?
A: We can supply the sample if we have ready parts in stock, but the customers have to pay the sample cost andÂ
the courier cost.We welcome sample order.
Q7. Do you test all your goods before delivery?
A: Yes, we have 100% test before delivery
Q8: How do you make our business long-term and good relationship?
1. We keep good quality and competitive price to ensure our customers benefit ;
2. We respect every customer as our friend and we sincerely do business and make friends with them,Â
no matter where they come from.
My name card
Model NO.: 10 inch
HS Code: 7610900000
               Â