Hydropower renovation is the key to the renovation project. Since all the pipelines are hidden after completion, it is not easy to change them after the problems in the transformation process.


Conch Cement     Fuhuai Stone

There are two modes for hydropower renovation construction. One is to choose a professional hydropower reform company, and the other is to let the decoration team all inclusive. Both methods have their own advantages and disadvantages. The former method will save some money. The disadvantage is that the decoration team may shirk responsibility in the later period of maintenance to increase the cost of the later period. The second method has a clear responsibility. If there is a problem, it will be settled. The disadvantage is that the expenditure is higher. Hydropower renovation accounted for a large proportion of the cost of renovation projects. Don't look for just wiring. The final expenditure is likely to be tens of thousands. Therefore, the choice of the two methods still requires the specific analysis of the specific problems of the owners in the decoration.

Early construction team

Do your homework before starting work and look at the lessons learned by your predecessors to avoid detours. The choice of professional hydropower team or decoration team to make early decisions, within a day or two after the start of the construction of hydropower projects will begin.

Choose to let the decoration team to change the hydropower all-inclusive, the main consideration is more worry, because there are too many things to consider in the decoration, can be less like it. Moreover, let the decoration team do, there is room for manoeuvre on the total price, there will be no problem in the construction process convergence.

Special Note: The unit price of hydropower must be determined before construction starts, the budget is also best determined, and the final total price should not exceed 10%, otherwise you will be stunned at the time of closing.

Waterway reconstruction

The waterway reform involves the kitchen and the bathroom. The main project content is to transform the household pipe and increase the hot water pipe. As with the change of electricity, there are also some pipes in the water pipe that are to be slotted into the wall.

The installation location of the water heater must be determined in advance so that the location of the water inlet and outlet of the water heater can be determined. The outlet of the water heater has two branches, one leading to the shower and the other to the sink.

There was no concept of hydropower reform in advance. Then there was the idea that it would be convenient to install several power outlets later. This resulted in unnecessary waste. At least one-third of the outlets are now unused, and the general decoration team In this respect will not remind you, after all, install one to make more money. After the completion of the hydropower project, remember to ask the construction team for a wiring plan. If there is any problem in the future, there is a good reference.

Hydropower renovation construction acceptance entrance decoration socket cement

Nano Sink

Nano is an innovative technology that can deposit very fine and thin metal films on products. Applied to stainless steel sinks, this technology ensures the durability and longevity of the product's color and helps maintain its beauty. Nano-coating makes the sink antibacterial, waterproof and oil resistant.


Nano Sink,Black Sink Kitchen,Nano Gold Sink,Nano Granite Sink

JIANGMEN MEIAO KITCHEN AND BATH CO.,LTD , https://www.meiaogroup.com

Posted on