What should I do if the formaldehyde exceeds the standard? The doctor pointed out that the newly renovated house is best to open the window and ventilate for more than two months before the check-in; the room that has already stayed must pay attention to ventilation and ventilation, and be careful to cause serious damage to the body due to the decoration pollution of the new house. Studies have shown that newly renovated and newly purchased furniture houses mainly five major pollutants such as formaldehyde, benzene, ammonia, volatile organic compounds and radioactive cesium. Uncontrolled control can harm the human body. In addition, the release cycle of decoration pollutants is very long, reaching 3 to 15 years. For the problem of excessive formaldehyde, everyone should be ventilated for two months as much as possible. At this time, the period of highest formaldehyde concentration has passed, and rushing to stay, some reasonable methods should be used to reduce the concentration of formaldehyde. First, ventilation and ventilation is the most effective and economical way to eliminate indoor pollution. On the one hand, the entry of fresh air can dilute indoor pollutants, which is conducive to the discharge of indoor pollutants; on the other hand, it helps the release of toxic and harmful gases in the decoration materials as soon as possible. Second, the use of professional treatment of formaldehyde over standard products, such as Anerya activated carbon products, Anerya activated carbon national environmental monitoring center report, monitoring results show that Anerya formaldehyde purification rate of up to 86.49% , the purification of benzene The rate reached 88.49%, the purification rate of toluene reached 76.99% ; the purification rate of p-xylene reached 76.92% , the purification rate of TOVC was 70.54% , and the purification rate of ammonia was 74.60% , which shows that the activated carbon of Anerya exceeded the standard. The problem can be a good solution, cctv7 CCTV broadcast brand, quality assurance , the audience full 450 ¥ national free delivery, free delivery in Qingdao area! Add formaldehyde test box, the detection effect is clear at a glance, check the more comfortable air with self-test formaldehyde, 40 minutes to get! Once you manage, don't be afraid of formaldehyde exceeding the standard and living in a new home! An effective product to solve the pollution hazard of new home decoration, 48 hours quickly effective, once governance, No worries for life! After the unanimous approval of the market and consumers, Anerya high-efficiency coconut shell indoor deodorization activated carbon uses physical adsorption, pure natural products, will not cause secondary pollution and cross-contamination, activated carbon is an internationally recognized drug addict, activated carbon mask, gas mask Activated carbon is used. The powerful pores can effectively lock the various effective gases such as formaldehyde, benzene and ammonia produced by the renovation of new houses. The warmth of the new deodorization center of Anerya New House, the pollution damage of new house decoration is very small, and the new house is renovated after adopting an environmentally friendly way to solve the new house decoration. Pollution problems, frequent ventilation, use activated carbon to protect your family's health! Anya new house decoration pollution control center hotline: 0532-87051356 welcome to inquire! In addition to formaldehyde http:// Decoration pollution hazard http:// How long after the renovation stays at http:// How to do formaldehyde over standard http:// How to remove formaldehyde http://
These butt weld fittings are made with the best quality of metal & cutting edge technology. Our customers can purchase these butt weld fittings from us at affordable rates.
1) Type: Straight Cross, Reducing Cross
6) Special design available
Materials:
3) Material: Carbon Steel, Alloy, Stainless Steel
4) Size: 1/2" through 48"
5) Schedule: Sch 510 - Sch XXS
Carbon Steel: A 106 Grade B Seamless, P-9, P-11 and P-22, 2205 Duplex
Aluminum: S-40, 6061-T6
Stainless Steel: 304/L, 316/L, 317/L, A 312 Welded or Seamless Pipe. Other alloys are available upon request.
Schedules:
Carbon Steel: All Schedules
Stainless Steel: Schedules 5 thru 160
End Prep: Beveled Ends; Squared Ends; Flanged Ends; Cut Grooves; Victaulic Grooves
Threaded Ends (Male & Female)
Pipe Cross,Seamless Pipe Cross,Galvanized Steel Pipe Cross,Stainless Steel Pipe Cross,Reducing Cross
Shijiazhuang Bang dong Pipeline Technology Co,Ltd. , http://www.bd-pipefitting.com