The first move aluminum buckle purchase Ceiling: Explanation: The suspended ceiling refers to a suspended ceiling decorated with suspended ceilings or ceilings. The outstanding feature of the suspended ceiling is its suspended structure of the skeleton and the decorative layer of the overcoat. The keel rods are used as the skeleton and the suspension and fastening measures are adopted. Then the suspended ceiling plates are installed on the skeletons, which are the many modern buildings. The structure of the indoor upper space is installed. Aluminum buckle purchase: Now the material of the bathroom ceiling has also evolved from the original PVC board to the current aluminum buckle board. The PVC sheet that has been popular in the past is a kind of extrusion molding material. The traces of industrialized machinery production are more obvious, lack of personalization, less change, and less coordination with the indoor environment. Aluminum buckle plate with a light aluminum stamping molding, long-term use will not fade, the construction is relatively simple, not easy to deformation. After the installation, there will be no bending or falling in the middle. It will ensure stability and reduce unnecessary expenses for replacement. Rich and varied colors can provide a variety of options for the host to create a personalized space. It is suggested that the kitchen with the smaller area is the best choice for strips, which can increase the sense of openness in the room and should be selected when there is a door-to-door service. Please pay attention to the following points when purchasing the aluminum buckle board: 1 Aluminium, aluminum used by good brands is the aluminum of a regular aluminum factory. The flexibility and strength are much stronger than those of aluminum. You can do an experiment and go to the store to find two brands with big price gaps. The model, bending him by hand, this time the aluminum (rubber board) will be easily bent, and will not restore the original shape, and a good aluminum bending will take more effort, And after bending, it will rebound to a certain extent, which is the difference in toughness and strength between aluminum materials. The 2 boards are divided into three types: spray coating, roll coating, and coating film. At present, the most popular film is a film with rich colors and colorful colors. 3 The aluminum buckle plate ceiling keel has two installation methods of light steel keel and wood keel. The wooden keel will be deformed after being exposed to moisture. It is better to use light steel keel to install. 4 It is more important to look at his services. A prestigious, pre-sale, and after-sales service for a strong brand is also perfect. 5 Thickness: The standard thickness is 0.6mm (national standard). The second move of material purchase 1, the choice of materials (1) The type, specification, and color of the aluminum buckle plate shall meet the actual requirements and shall have a product qualification certificate. (2) The surface of the aluminum pinch plate should be flat, not angular, with even edges and no damage. 1. Material cost: Generally, it includes the cost of aluminum buckle board, corner cost and keel cost, among which some manufacturers of keel will be given according to the standard ratio. If the type of the house is irregular, the keel may exceed the normal standard. In this case, the manufacturer will charge an extra keel fee. 2. Installation cost: The installation price provided by the general manufacturers is between 15 and 30 yuan per square meter. If there is any package pipe or special shape, it will be discussed separately. The third measure: prepare in advance: Under the material: Cut according to the size of the wall. Measure the scale carefully to prepare for later cuts. The fourth stroke of the ceiling began (a). Process flow Measure payoff line→fixed boom→install side keel→install main keel→install sub-keel and support keel→install the decorative panel→install the pressure strip and take-off strip (B). Operation method 1. Measuring line (1) Based on each wall (pillar) in the room as a base point and then use a pencil or other tool to draw a vertical horizontal line along the wall (column). This line is used as the standard line to install the keel when the ceiling is suspended. (2) The main keel spacing is generally 900 ~ 1000mm uniform layout, arrangement should try to avoid embedded devices, and in the main keel position line with a crosshair marked fixed boom position. The distance between the booms should be 900-1000mm, and should not exceed 300mm from the end of the main keel and be evenly arranged. 2. Fixed boom Explanation: boom (1) The role of the boom: to bear the load of the ceiling surface and the dragon frame, and transfer this tea load to the load-bearing structure of the roof. (2) Material for booms: Mostly rebars are used. The prepared metal suspenders should be treated with antiseptic. The boom was punched with an impact hammer and bolted to the floor. Hangers should be straight and have sufficient load capacity. Tip: Luminaires, vents, access openings and other equipment on suspended ceilings shall be installed with independent booms and shall not be fixed on keel booms. Keel installation: 3. Installation side keel The side keel should be installed with a good ceiling line. When installing the side keel by brushing the adhesive on the side of the wall, it is screwed onto the concrete wall (column). The spacing between the fixed points should not be greater than the spacing of the ceiling secondary keels, typically 300 to 600 mm, to prevent deformation. 4. Install the main keel (1) Special hangers and booms should be used for installation. The center of the boom should be on the centerline of the main keel. The main keel installation spacing - generally 900 ~ 1000mm, arranged along parallel lines. Due to the lack of length of the main keel, special connection pieces shall be adopted when the length of the main keel is extended. The hanging points of each main keel shall not be less than two. The joints of two adjacent main keels shall be staggered with each other and shall not be placed in the same boom file. This will ensure the stability of the main keel. Tip: There is a larger ceiling, the shape part should form its own frame, with a suspender directly linked to the ceiling plate. (1) Heavy-duty lamps, ceiling fans and other professional equipment are strictly prohibited to be installed directly on the ceiling keel. After the main keel has been installed, it should be leveled once and attention should be paid to adjusting the degree of crowning. 5. Installation of secondary keel The metal sub keel is fixed to the main keel with a special connector. The secondary keel must be docked and must not be lapped. ―The number of keel spacing is not more than 600mm. Humidity or important places, sub-keel spacing should be 300 ~ 400mm. The wall-side of the secondary keel should be placed on the horizontal flange of the side keel. When the sub keel needs to be extended, special connectors should be used for connection and fixation. The fixing points of each sub-keel and main keel shall not be less than two, and the joints of two adjacent secondary keels shall be staggered with each other, and shall not be placed in the same file of two main keels. Install the aluminum buckle panel: (1) When the skeleton is a metal keel, the aluminum buckle plate is generally fixed by screws. Use special hanging connectors and connectors for fixing. In order to ensure a stable installation, it is possible to use an adhesive compound adhesive method at the gap of the veneer panel. Note that strong vibration must not be applied before it is completely cured. Tip: The layout of various lamps, smoke detectors, shower heads, and tuyere on the aluminum buckle plate should be reasonable and beautiful, and the junction with the veneer should be consistent and tight. 7. Edgeband The junctions between the ceilings of the various aluminum buckle panels and the surrounding wall surfaces shall be edged according to design requirements or using edge strips, female corners or closing strips that are compatible with the material of the aluminum buckles. Edges, closing strips can be pasted with adhesive, but must ensure that the installation is solid, reliable, flat and straight. Finished product protection 1. Skeletons, aluminum gussets and other materials shall be stored in the warehouse and placed neatly after entering the site. Heavy objects shall not be placed above. Open storage must be covered to ensure that all materials are free from moisture, mildew, and deformation. 2. When installing the framework and aluminum buckle plate, care should be taken to protect various pipelines and equipment in the ceiling. Hangers, keels, and veneers must not be fixed to other equipment and pipes. 3. In the construction of ceilings, the completed lands, walls, doors, windows, and windowsills must be protected to prevent pollution and damage. 4. After the skeleton of the ceiling is not installed, it must not be stomped on. Other hanging parts or heavy objects are forbidden to be installed on the ceiling skeleton. 5. When installing the aluminum gusset plate, workers should wear a clean line of gloves to prevent contamination of the plate or the edge of the plate. Should pay attention to the quality acceptance problem: 1. Strictly press the good level and position control line to install the peripheral frame; the force node should be connected with a firm piece to ensure the overall rigidity of the frame; the specifications and dimensions of the keel should meet the design requirements, and the arching should be uniform in both vertical and horizontal directions. Adapt to each other, the metal keel is strictly prohibited to have a hard bend to ensure that the ceiling skeleton is installed firmly and flat. 2. Before construction, the horizontal line of the ceiling shall be accurately ejected. During the installation of the keel, attention shall be paid so that the entire bottom surface is flat and the middle degree of crowning conforms to the requirements. When the keel length is long, the special pendant shall be used for butting; the joints of adjacent keels must be staggered, and the keel must not be tilted to one side; Hangers must be securely mounted and the force of the hangers must be the same. There must be no slack, bend, or skew. After the installation of the keel is completed, the decorative panel shall be installed to ensure the flatness of the suspended ceiling. 3. Before the installation of the aluminum buckle plate should be tested block by block, the corners must be regular, the dimensions should be the same; when installing, the crossbar must be pulled to control the edge of the line; the mounting bead should be installed by the line; the joints should be uniform, smooth and smooth. The lines are neat and close together. 4. For the holes and holes reserved for light steel skeletons (lamps, vents, etc.), the construction of the keel and connecting parts should be set according to the specification and atlas. Avoid deformations and cracks around holes and holes. 5. The suspenders and skeletons shall not be hung on the pipelines and equipment in the ceiling. The suspender nut shall be adjusted and tightened. The connection between the light steel skeleton must be firm and reliable. In order to avoid deformation of the skeleton to make the roof uneven, cracking. 6. When the aluminum gussets and blocks are cut during blanking, the cutting angle should be controlled. The burrs and chippings of the cuts should be trimmed and straightened. Avoid problems such as obvious seams, leaky connections, uneven seams, and misaligned seams. 7. Holes and holes reserved for lighting fixtures and smoking holes should be put on the line before opening the hole to ensure accurate position and the fitting of suspended ceiling and equipment is consistent and tight. The following important issues and corresponding regulations shall be observed in the construction of suspended ceilings: 1. Hanger, keel installation spacing and connection methods should meet the requirements of the design. After embedding, metal hangers, keels should be treated with anti-corrosion. Wooden hangers, wooden keels, styling wood panels and wood veneer panels should be treated for corrosion protection, fire protection and anti-smashing. 2. The ceiling materials used should take corresponding measures during transportation, handling, installation and storage to prevent moisture, deformation and damage to the surface and corners of the plates. 3. The size of the suspender of the suspended ceiling from the end of the main keel shall not be greater than 300mm, otherwise booms shall be added. When the length of the boom is greater than 1.5m, anti-support should be set. When the boom and the equipment meet, the boom should be adjusted and added. 4. Heavy-duty lamps, fans and other heavy equipment on the ceiling shall not be installed on the keel of the ceiling project. 5. The type and laying thickness of sound-absorbing and heat-insulating materials filled in the suspended ceiling shall meet the design requirements, and measures shall be taken to prevent them from falling. 6. The location of lighting, smoke detectors, shower heads, air outlets, etc. on the veneer should be reasonable and beautiful, and the junction with the veneer should be tight. The transfer of suspended ceilings to wall surfaces and curtain boxes shall meet the design requirements. 7. In the case of a shelf-mounted light-weight veneer, press-fit devices should be provided as required by the design. 8. The type of adhesive used in the project should be selected according to the type of decorative panel used. Ceiling Mounting Decoration Decorating Doors Price Space Kitchen & Bathroom Ceilings Ceiling Fan Lights Bathroom Doors Bathroom Ceiling Material Bathroom Door Size Bathroom Size Bathroom Ceiling Overall Bathroom Toilet Design
Cylindrical Lenses,Cylindrical Power Lenses,Cylindrical Lenses Optics,Optical Density Filters Lambda Research Optics ChangChun,LTD. , https://www.lambdachina.com
With the characteristics of light weight, water resistance, non-dusting, anti-corrosion, easy scrubbing, easy installation, strong three-dimensional sense, soft color and nice appearance, it is very popular among users.
Tip: The general aluminum buckle board costs are as follows: