When temperature and humidity begin to change, we need to pay attention to the construction problems of epoxy floor paint (click to enter) and construction problems of hot melt floor coating.

First, the influence of temperature

1, high temperature. If the temperature is too high, the hot-melt coating material will flow too much, flow into the gaps in the road, and cut the seams.

2, low temperature. If the temperature is too low, the solidification of the hot-melt coating will cause uneven edges.

Second, the impact of humidity.

High temperature, wet weather. The hot-melt coating is crossed. If the air is wet and the ground is high in temperature, water bubbles on the ground will evaporate into bubbles after the construction, causing bubbles on the hot-melt coating line.

In general, cement concrete floors need to be dried for three days before they can be constructed. If the construction is carried out in advance, improper quality cannot be guaranteed, and the evaporation of water vapor on the ground will be delayed, and the construction period will be delayed.