1, stirring Add 90% of the construction water to the mixing vessel, then pour it into the diatom mud dry powder for a few minutes, then stir it with an electric mixer for about 10 minutes, stir while using another 10% water to adjust the construction consistency, muddy coating. Stir well before use. 2, smear Two times: the first pass is about 1 mm after the finish is about 50 minutes (depending on the weather conditions, the surface is not sticky, and the bottom is covered with the material), the second pass (thickness is about 1.5) Mm). The total thickness is between 1.5 mm and 3.0 mm. 3, texture pattern production Most people like flat diatom mud. If you like personality, you can master the drying time according to the actual environment drying conditions, and make the texture pattern according to the engineering method. 4, receiving light After the texture pattern is made, the light is collected by the light-receiving trowel along the pattern line. Bathroom Accessories,Shower Accessories,Bathroom Facilities,Home Bathroom Accessories JIANGMEN MEIAO KITCHEN AND BATH CO.,LTD , https://www.meiaogroups.com