First, the initial measurement of attention The first time the cabinet designer first door measurement is based on the requirements of the owners to do the transformation of the water circuit, so the first time the owners must consider the use of electrical appliances in the kitchen. Such as ovens, microwave ovens, rice cookers, dishwashers, water heaters, water purifiers, water purifiers, washing machines, refrigerators and so on. If you do not have to reserve line pipe to use later, it will be very troublesome, it may also cause danger.
Second, after the initial measurement
1. Please reply to the e-mail or call back after receiving the designer's drawings. If there is any change, please contact the designer in time. Please put the drawings on the site to prepare for the installation of ceilings and hoods.
2. When wall tiles, floor tiles, ceilings, gas pipelines, and water lines are all constructed, contact the designer 1-2 days in advance to determine the second measurement time.
3. The owner informs the designer of the dimensions of the self-contained appliances and the dimensions of the basin and the opening dimensions.
4. After the second measurement, you can sign a contract with the cabinet company.
5. The general production cycle is 20-25 days and the solid wood door panel is 60 days.
6. Many manufacturers of quartz countertops may require secondary installations. The time is to install the countertops 7-10 days after the cabinets are installed. When you sign a contract, be sure to ask clearly.
The cabinet designer's first-time measurement should pay attention to what matters to buy the cabinet. Once the brand is determined, the next step is to measure the cabinet designer's first door-to-door measurement and give you a diagram of the kitchen hydroelectricity. So where does the first measurement need attention? Here's a simple analysis for you.